We Installed a water chiller system in an industrial situation. The water in this situation was needed to cool an analyser. We had to work within a very tight time frame because analyser’s job was to test product and stopping the analyser meant a large loss in productivity. Our solution involved building and installing a custom water unit and truck.
The outcome was a seamless solution with very minimal impact and a really pleased customer